New house project #1

The garage before and after. The garage has a window unit A.C. It’s super loud, but it works great. The entire garage is insulated too. This will be where the kids hang ALL summer while I’m working on asbestos removal (although that will be done without the children on site), carpet, baseboards, tile, drywall, bathroom demo, etc… It’s a lot of demo.

First use the van sunbrella as an arm extension to crank on the AC. Short girl problems.
Power wash walls and floor. Acid wash. Scrub. Scrub. Power wash. Acid wash. Scrub and rinse. Rinse a lot.
Days later you get to epoxy patch all the holes and cracks.
Then you get to epoxy paint and chip the floor.
And days after that your babes get to move into their new temporary space. Jon and I will use this space as a bedroom while the addition is being built. Making the floors and walls nice was tons of work, but will be so worth it.
They’ve got a lounge space, chairs, desk, t.v., and games.
Oh. And ALL the snacks.

Clean, safe, air conditioned space for the babes to chill in while Mom demos an entire house so we can fix up the good bones and someday move in.

Leave a Reply

Your email address will not be published. Required fields are marked *